Site Feasibility Study
Where a pool can go, how it gets permitted, what it will take to build and what it should cost. A clear, written answer from people who build pools in Florida, delivered inside your inspection period.
Why it matters
Buyers find out after closing that the setbacks leave room for a plunge pool, the easement runs through the best spot, or the oceanfront lot needs a state permit and a pile foundation. A feasibility study puts those facts on the table while you can still negotiate, change plans or walk away.
| Common surprise | What it can mean |
|---|---|
| Side and rear setbacks | A smaller pool or a different layout than you pictured |
| Utility or drainage easements | Areas where you can't build at all |
| Flood zone and elevation | Raised pool or deck, added engineering and cost |
| Coastal control line | State permit, design limits and a longer timeline |
| HOA or architectural review | Extra approvals, materials or screening rules |
| Access for equipment | Crane or small-equipment work that changes price |
What's included
Oceanfront and coastal lots
Seaward of Florida's Coastal Construction Control Line, a pool generally needs a state permit on top of local approvals, along with a recent signed and sealed survey and a design that limits excavation of the dune system. Some sites qualify for a streamlined general permit. Others don't.
We've taken an oceanfront pool on pilings through that process in Ponce Inlet. A coastal study tells you which path your lot is likely on, what it means for design and cost, and how long it really takes.
Read the CCCL guideWho it's for
Schedule it inside your inspection or due diligence period. The answer can change your offer, or whether you buy.
Get pool constraints in front of your architect early, so the house, grades and drainage are designed around them.
Replacing an older pool on a tight or coastal lot? Know what current rules allow before you tear anything out.
Questions
Most studies are delivered within 10 business days of the site visit. Coastal lots that need records from the state or county can take longer, and we tell you up front.
Yes, and that is when it is most valuable. Many clients schedule the study inside their inspection or due diligence period.
A recent boundary survey helps and speeds things up. For oceanfront lots, state coastal permitting generally requires a signed and sealed survey showing the control line, so we will tell you if yours is sufficient.
No. It is an informed professional opinion based on the records, site conditions and our permitting experience. Final approval rests with the permitting agencies.
Book it
Send the address, your timeline and any survey you have. We'll confirm scope and a flat fee within one business day.
Under contract with a short inspection period? Say so in the message and we'll prioritize it.